When is the State not the State?

The University of Texas MD Anderson Cancer Center is an agency of the State of Texas. Nobody in the case disputed it. On Wednesday, October 28, the Eleventh Division held that MD Anderson is nonetheless not a “governmental entity” as Chapter 25A defines the term, because the Legislature wrote “this state” and its political subdivisions, and stopped there. A contract suit seeking more than $315 million, begun in a Harris County district court, stays in the Texas Business Court (The Univ. of Tex. MD Anderson Cancer Center v. UnitedHealthcare of Texas, Inc., 2026 Tex. Bus. 77, ¶¶ 12, 28–30).

Issue
No. 25
Nov 2
New opinions
3
Nos. 75–77
Opinions in corpus
140
feed read Oct 31, 2026
Register high
2026 Tex. Bus. 77
signed Oct 28

Three signed opinions arrived this week. They come from two judges in two divisions, they concern a cancer hospital, a crude-oil terminal and a San Antonio apartment complex, and they have nothing in common on their facts. They have something in common in method. In each, part of the reasoning turned on a word the drafter used somewhere else and left out here.

In this issue

2026 Tex. Bus. 77 · MD Anderson Cancer Center v. UnitedHealthcare of Texas

Citation2026 Tex. Bus. 77 (11th Div.)
StyleThe University of Texas MD Anderson Cancer Center v. UnitedHealthcare of Texas, Inc.
Cause No.26-BC11A-0097
SignedWednesday, October 28, 2026
JudgeBarnard, J. The signature block reads “Judge of the Texas Business Court” with no division and no assignment line; the register lists the opinion under the Eleventh Division.
DispositionMD Anderson’s motion to remand denied. Interlocutory; the case stays in the Business Court and proceeds on the merits. The opinion establishes no liability and awards no damages.
Paragraphs¶¶ 1–30, preceded by a staff syllabus the court disclaims. Pin cites below are to the numbered paragraphs of the opinion, never to the syllabus.

What happened

In 1996 MD Anderson and UnitedHealthcare of Texas signed a Hospital Participation Agreement governing their relationship (¶ 2). MD Anderson says UnitedHealthcare did not meet its obligations under that agreement and seeks damages exceeding $315 million (¶ 2). It filed in the 55th Judicial District Court of Harris County. UnitedHealthcare removed the case to the Business Court under Government Code § 25A.004(d)(1), the qualified-transaction hook (¶ 3).

MD Anderson then moved to remand on a jurisdictional ground that no earlier opinion on the register addresses. Chapter 25A excludes from the Business Court’s jurisdiction, unless the claim falls within the court’s supplemental jurisdiction, “a claim in a civil action . . . brought by or against a governmental entity.” MD Anderson is an agency of the State of Texas. Its argument was that an agency of the State is the State, and the exclusion therefore applies (¶ 4). UnitedHealthcare did not dispute that MD Anderson is a state agency. It argued that the Legislature chose not to put state agencies inside the definition (¶ 5). The parties agreed MD Anderson is a state agency and not a political subdivision, which narrowed the case to a single question of statutory construction (¶ 8).

The rule of law

A state agency’s status as an agency does not make it a “governmental entity” within Government Code § 25A.001(6), which names “this state” and its political subdivisions. MD Anderson, which the parties agreed is not a political subdivision, was therefore not excluded by § 25A.004(g)(1)(A), and its contract suit stays in the Texas Business Court on the parties’ agreement that § 25A.004(d)(1) is satisfied.

2026 Tex. Bus. 77, ¶¶ 8, 12, 28–30.

The court began where Texas statutory construction begins: with the words, read in the context of the framework as a whole (¶ 9). It then drew a distinction that does most of the work in the opinion. MD Anderson’s governmental status is not in question; what is in question is its classification under one particular definition. “But the fact that an institution possesses governmental status for one purpose does not necessarily establish its classification under a different statutory definition” (¶ 11).

Turning to the definition, the court found an omission and said so plainly.

Section 25A.001(6) expressly identifies two categories: “this state” or political subdivisions of the State. The definition does not separately identify state agencies, departments, boards, commissions, university systems, or institutions of higher education. 2026 Tex. Bus. 77, ¶ 12

Then it did something a reader should notice, because it is the opposite of overreaching: it argued against itself. Other statutes do name those entities. Government Code § 572.002(10) defines “state agency” to include a university system or an institution of higher education, and Civil Practice and Remedies Code § 101.001(3)(A) defines “governmental unit” to include the State and the agencies that collectively constitute its government (¶ 13). Those definitions show the Legislature knows how to name agencies when it means to (¶ 14). And yet: “Nevertheless, the omission alone does not resolve the dispute. If ‘this state’ already encompasses the State’s constituent agencies, their separate enumeration would not necessarily be required” (¶ 14). The silence had to be shown to be a choice.

The comparison the court called persuasive and refused to call conclusive

What showed it, on the court’s reasoning, was the statute next door. Both Chapter 25A and Government Code § 22.220(d)(1), the provision giving the Fifteenth Court of Appeals its exclusive intermediate appellate jurisdiction, govern courts the Legislature created in 2023 (¶ 18). The two provisions do not use the same words.

Both texts are quoted from the official compilation at statutes.capitol.texas.gov, not from the opinion. Emphasis has not been added or removed.
ProvisionThe words the Legislature used
Gov’t Code § 25A.001(6)
Business Court; definition of “governmental entity”
“Governmental entity” means: (A) this state; or (B) a political subdivision of this state, including a municipality, a county, or any kind of district.
Gov’t Code § 22.220(d)(1)
Fifteenth Court of Appeals; exclusive intermediate appellate jurisdiction
… matters brought by or against the state or a board, commission, department, office, or other agency in the executive branch of the state government, including a university system or institution of higher education as defined by Section 61.003, Education Code …

“The court presumes that the Legislature’s choice of different language in these related jurisdictional provisions was meaningful” (¶ 18). But the opinion then states MD Anderson’s best answer in MD Anderson’s own favour. Section 22.220(d)(1)’s express references may have been written to clarify the Fifteenth Court’s reach, rather than to establish that agencies are categorically distinct from the State. Having put that answer, the court concedes the limit of its own comparison: “The court therefore does not treat the language of section 22.220(d)(1) as conclusively establishing the meaning of ‘this state’ in Chapter 25A” (¶ 19). The comparison is “persuasive evidence,” no more (¶ 20).

MD Anderson’s remaining authorities were sovereign-immunity decisions recognising that state agencies and public universities are governmental entities entitled to immunity. The court did not question them; it held they answer a different question (¶¶ 21–23). “Sovereign immunity concerns the circumstances under which the State and its governmental instrumentalities may be subjected to suit. The present dispute concerns the allocation of jurisdiction among Texas trial courts over an action brought by a state institution” (¶ 24).

The conclusion follows the method:

Reading “this state” in section 25A.001(6) to encompass every state agency would effectively extend the definition to a category the Legislature did not expressly include, notwithstanding its demonstrated practice of identifying that category in other statutes. The court declines to adopt that construction. 2026 Tex. Bus. 77, ¶ 28
In plain English

The Texas Business Court is a court built for big commercial disputes, and the statute that created it keeps certain cases out. One of the exclusions is for lawsuits brought by or against a “governmental entity.” The question in this case was whether a state cancer hospital counts.

Everyone agreed MD Anderson is an arm of the State of Texas. But the statute does not say “arms of the State.” It says “this state” and lists local governments: cities, counties, districts. It does not mention agencies or public universities. Other Texas statutes, when they mean to cover a state university, say so in those words. The statute that set up the new appeals court, written in the same year by the same Legislature, spells out “university system or institution of higher education.” Chapter 25A does not.

The judge treated that difference as deliberate: when a drafter spells something out in one place and leaves it out in another, the omission usually means something. So MD Anderson is a state agency and is not a “governmental entity” for this purpose, and its case belongs in the Business Court.

What this ruling does not do: it decides nothing about whether UnitedHealthcare breached the 1996 agreement, and it awards no money. It decides which courthouse the fight happens in.

Why this one matters beyond its own docket

The exclusion the court construed is symmetric. Section 25A.004(g)(1)(A) reaches a claim “brought by or against” a governmental entity, so the court’s reading of the definition bears on suits brought against state agencies as well as suits they bring, where the subject-matter and amount hooks in § 25A.004 are satisfied. Texas has a great many state agencies and institutions of higher education, and they sign a great many large commercial contracts.

For anyone drafting or litigating one of those contracts, the practical point is narrower than it first looks. Where a § 25A.004 hook is met and immunity does not bar the claim, the governmental-entity exclusion no longer keeps a state agency’s contract dispute out of the Business Court. Whether the agency can be sued at all is a sovereign-immunity question this opinion leaves alone (¶¶ 23–24). Two cautions attach: the ruling is subject to review by the Fifteenth Court of Appeals, and one division’s construction of a statute does not bind the others.

An open question: the asymmetry inside the definition

The opinion decides that a state agency is outside the definition. Read against the text of § 25A.001(6), that produces a result worth asking about rather than asserting. Subparagraph (B) covers “a political subdivision of this state, including a municipality, a county, or any kind of district.” A hospital district, a water district or a river authority is at least arguably a district. Section 572.002(10) treats a river authority and an institution of higher education alike, as “state agencies.” Chapter 25A, on this opinion’s reading, does not.

So the question we would want answered, and are not going to answer here, is whether Chapter 25A now sorts public bodies by a line that tracks neither the sovereign-immunity cases nor § 572.002: a state-chartered university inside the Business Court’s jurisdiction, a hospital district outside it. The opinion does not reach that comparison, because it did not have to. A litigant on the other side of that line will.

Two further limits, stated so that nobody reads more into the opinion than it holds. The court did not apply the supplemental-jurisdiction exception that § 25A.004(g) opens with; it mentions the exception and does not use it (¶ 7). And the parties’ agreement that the action satisfies § 25A.004(d)(1) means the qualified-transaction hook was never analysed (¶ 29). Whether a 1996 hospital participation agreement is a “qualified transaction” is a question this opinion leaves entirely alone.

2026 Tex. Bus. 76 · DK Trading & Supply v. Wink to Webster Pipeline

Citation2026 Tex. Bus. 76 (mem. op.)
StyleDK Trading & Supply, LLC v. Wink to Webster Pipeline LLC
Cause No.25-BC11B-0073
SignedWednesday, October 28, 2026; entered the same day
JudgeSharp, J., signing as “Judge of the Texas Business Court, Fourth Division, sitting by assignment in the Eleventh Division.” The register heading reads “(11 Div.).”
DispositionDelek’s traditional summary-judgment motion granted in part. Breach of the Terminal Agreement: granted. Breach of the Transportation Agreement: granted. Event of Default under § 12.01: declared. Damages on the Terminal Agreement: denied, fact issues remain. Fees, pre- and post-judgment interest and costs: carried to trial. In any remaining respect, denied. Interlocutory.
Paragraphs¶¶ 1–35, then an unnumbered conclusion and order on the final page. This is the second summary-judgment opinion in the same cause; the first is 2026 Tex. Bus. 33.

What happened

Two 2021 agreements govern crude-oil storage at, and pipeline transportation from, a multi-tank terminal in Midland County (¶ 2). Under the Terminal Services Agreement, Wink to Webster agreed to give Delek specified storage capacity, maintain the pipeline connection, accept crude meeting either the pipeline tariff’s specifications or Delek’s own, and stage deliveries (¶ 3). Under the Transportation Agreement, Delek agreed to ship a volume commitment each true-up period or pay a deficiency payment (¶ 4). In its first opinion in the case the court construed both agreements as a matter of law, holding among other things that Wink must provide two tanks for Delek’s exclusive use, available “at all times” (¶ 9, citing 2026 Tex. Bus. 33, ¶ 10). Delek then moved for summary judgment on breach of both agreements and on damages. The court heard argument on Tuesday, October 6, 2026 (¶ 1).

Breach proven; damages not

On exclusivity, Delek won without much difficulty. Its inventory records showed crude in the two Delek Tanks in every month from December 2021 through July 2026, including months before Delek had nominated any crude at all (¶ 10). Wink had a contractual right to substitute two other tanks but did not claim it had done so, and offered no other justification for third-party crude in Tanks 125169 and 125170 (¶ 11). Its answer was that the inventory records show volumes, not whose crude it was, so that Delek had not proved “whose crude it contends was held in the” tanks (¶ 12).

The rule of law, holding one

Breach of a contractual promise of exclusive use does not depend on identifying which third party used the thing. Whose crude occupied the tanks is not an element of breach of an exclusivity clause.

2026 Tex. Bus. 76, ¶ 13. One month, February 2022, is excepted on the record: n.2.

Damages were a different matter, and this is the part of the opinion a commercial litigator should read twice. Delek’s theory was benefit of the bargain: it had paid more than ten million dollars over the relevant years, it received nothing of value, and the difference is the damage. Wink did not contest what the contract promised. It contested what Delek received (¶ 15).

And the court agreed that the question could not be answered as a matter of law, for a reason that is entirely about how the contract was written: exclusivity was not the only promise in it. Wink had also promised to receive crude meeting either grade, to store it, to stage deliveries, to maintain and repair the tanks, and to indemnify and submit to audits (¶ 16). Wink has been receiving, storing and staging Delek’s crude throughout. On top of that, in every month but one Delek chose to store only tariff-grade crude. Wink’s unobjected-to expert evidence was that there is “no operational purpose or commercial benefit” to storing tariff-grade crude in a segregated manner. A second expert opined that the monthly payment “reflects the value the parties assigned to Delek’s right to ship a segregated crude grade” (¶ 17). Delek did not object to either opinion.

The rule of law, holding two

On this record, where a contract promises a bundle of services and the movant proves breach of one of them, benefit-of-the-bargain damages measured as the whole contract price were not established as a matter of law. The movant must still prove the value received, and unobjected-to expert evidence that the breached right had little or no operational value raises a fact issue on that element.

2026 Tex. Bus. 76, ¶¶ 14–19, applying MSW Corpus Christi Landfill, Ltd. v. Gulley-Hurst, L.L.C., 664 S.W.3d 102, 106 (Tex. 2023), as the court cites it at ¶ 14.

In plain English

Delek rented two tanks it was promised it would have to itself. The terminal put other people’s oil in them. That much the court found proven, and it did not matter that Delek could not say whose oil it was; the promise was exclusivity, and exclusivity was broken.

Delek then asked for all of its money back, more than ten million dollars of monthly payments, on the theory that a tank it had to share was worth nothing. The court said that does not follow. The terminal was also promising to receive the oil, hold it, and move it onto the pipeline, and it did all of that. Worse for Delek, the terminal’s experts said segregating the ordinary grade of crude Delek actually shipped has no practical value, and Delek did not challenge them. So what the sharing cost Delek is a question for trial, not a number the judge could write down now.

The lesson is unglamorous and expensive: proving that a promise was broken is a different job from proving what the promise was worth, and a contract that bundles several promises into one monthly fee makes the second job harder.

A cured overcharge is still a default

The second agreement produced the cleaner win and the more portable rule. Section 7.03 of the Transportation Agreement sets the formula for Delek’s deficiency payment, and the court had already held in its first opinion that there is “only one reasonable meaning to Section 7.03 and the calculation it requires” (¶ 21). Applied to the true-up period ending Thursday, July 31, 2025, the formula produced a deficiency payment of $14,002,139. Wink invoiced $14,454,100, an overcharge of $451,961 (¶ 23). Wink neither objected to the evidence nor offered a contrary theory.

Delek asked for more than a finding of breach. It asked for a declaration that the overcharge was an “Event of Default” under § 12.01(c), which is defined to include the failure of a party “to comply with any of its obligations under” the agreement where the failure “remains uncured for thirty (30) Business Days after written notice thereof” (¶¶ 25, 27). Delek gave written notice on Friday, August 15, 2025, identifying the miscalculation (¶ 29). Wink did not fix it within thirty business days. It credited the disputed amount in August 2026, a year later and after the court’s first summary-judgment ruling (¶¶ 30, 33).

The court resolved the meaning of “default” by following the Eighth Division’s precedent in 2026 Tex. Bus. 22, and because that opinion is digital text we quote it directly rather than through this week’s reproduction of it.

The ordinary meaning of “default” confirms this reading. The noun “default” means a “failure to do something required by duty or law.” That definition is straightforward and widely understood. Nothing in the term itself requires that the failure be material, incurable, or formally declared. The Mark at Weatherford Owner, LLC v. German, 2026 Tex. Bus. 22, ¶ 29 (8th Div.), read from that opinion’s own signed PDF; cited in 2026 Tex. Bus. 76, ¶¶ 26–27
Had the parties intended to confine the Automatic Trigger provision to particular types of defaults—uncured defaults, material defaults, financial defaults—they would have done so expressly. They did not. 2026 Tex. Bus. 22, ¶ 30, quoted in 2026 Tex. Bus. 76, ¶ 31, with “Automatic Trigger” replaced by a bracketed “[contractual]”

This week’s opinion then supplied the detail that makes the inference irresistible on these facts. The Transportation Agreement does carve out “non-material noncompliance” for exactly one clause, § 18.01, the compliance-with-law provision. “No other ‘non-material’ violations are excepted from the Agreement’s broad definition of the term” (¶ 27). The drafters knew how to write a materiality qualifier. They wrote one, once.

Wink’s last argument was mootness: it had credited the money, so what was left to declare? The court held the claim was not moot because a declaration of default triggers the agreement’s § 12 remedies, including the right to withhold deficiency payments, to suspend performance, or to terminate. A ruling that could affect those rights is not moot (¶¶ 32–33, citing Heckman v. Williamson County, 369 S.W.3d 137, 162 (Tex. 2012), as the court cites it).

The rule of law, holding three

A failure to comply with a contractual obligation that remains uncured for the period the contract specifies after written notice is an Event of Default under a clause so defined. Where the clause excuses non-material noncompliance with one provision only, the size of the failure does not matter anywhere else. A later credit of the disputed amount does not moot a request for a declaration of default, because the declaration triggers the contract’s default remedies.

2026 Tex. Bus. 76, ¶¶ 27–33 and order (3), which declares the default and grants no remedy, carrying 2026 Tex. Bus. 22, ¶¶ 28–32 into a second division.

In plain English

A long commercial contract usually has a clause saying what counts as a “default” and what the other side may do about one: stop paying, stop performing, walk away. Defaults are therefore not a technicality; they are a switch.

Wink sent an invoice that was $451,961 too high. Delek wrote and said so. Wink did nothing for a year, then issued a credit after the court’s first ruling construing the contract. Wink’s position was essentially: we fixed it, so there is nothing to declare. The court disagreed on both halves. Because the contract defined default as any uncured failure to comply, and because the cure window had closed long before the credit, the default happened. And because declaring it switches on Delek’s remedies, the declaration still matters even though the money came back.

Two drafting notes fall out of this. If you want only serious failures to count as defaults, write that into the default clause. And if you write a materiality carve-out for one clause and not the others, you have told a court the others were meant to be broad. And if you are the party in breach, a late fix is not the same as a cure.

2026 Tex. Bus. 75 · Passco Cos. v. Rim WP Apts.

Citation2026 Tex. Bus. 75 (4th Div.)
StylePassco Companies, LLC; Passco Management Services, LP; Passco Tribute DST; and Passco Tribute MT, LLC v. Rim WP Apts, LLC; Rim WP Holdings, LP; Kairoi Management, LLC; Kairoi Development, LLC d/b/a Kairoi Residential d/b/a Lynd Development LLC a/k/a Lynd Development Partners; Daniel Zunker; and Michael Lynd, Jr.
Cause No.26-BC04A-0002
SignedMonday, October 26, 2026
JudgeBarnard, J., signing as “Judge of the Texas Business Court, Fourth Division”
DispositionPartial summary judgment granted. Plaintiffs’ fraud, fraud in the inducement, fraud by nondisclosure, civil conspiracy and declaratory-judgment claims against Rim WP Holdings LP, Kairoi Development, Zunker and Lynd: dismissed with prejudice. Plaintiffs’ pre-acquisition sub-management claim against Kairoi Management: dismissed with prejudice. Not a final judgment.
Still pendingPlaintiffs’ claim for breach of the May 31, 2019 sub-management contract against Kairoi Management, and Plaintiffs’ fraud and PSA claims against Rim WP Apts, LLC, the one defendant that did not move (¶¶ 9, 60, n.2)
Paragraphs¶¶ 1–60, six footnotes, staff syllabus at p. 2 with its disclaimer

What happened

Tribute at the Rim is a San Antonio apartment complex, developed in phases and completed in 2018 (¶ 3). On Wednesday, May 15, 2019, Passco contracted to buy it; the deal closed on Wednesday, June 5, 2019, after a due-diligence period (¶ 4). In March 2021 Passco found severe water penetration, which its experts traced to systemic and isolated defects in the building envelope: water-resistive barriers, perimeter sealing, roofing membranes (¶ 5). It sued on Friday, May 6, 2022 in the 73rd Judicial District Court of Bexar County; the parties filed an agreed notice of removal to the Business Court on Thursday, March 26, 2026 (¶ 6, n.5). Five of six defendants moved for partial summary judgment; the seller did not (¶ 1, n.2). The court heard argument on Tuesday, September 15, 2026, and overruled every objection to the summary-judgment evidence (¶ 2, n.3).

The disclaimer holds

The purchase and sale agreement contained a disclaimer-of-reliance and “as is” clause at ¶ 2.6, set in predominantly bold capitals and quoted in full at ¶ 20 of the opinion. It carves out exactly three things: the seller’s representations in ¶¶ 6.6 and 7.1, and the title warranties (¶ 21). The court held the clause clear and specific, measured against Forest Oil and Schlumberger. It then held that the surrounding circumstances favoured enforcement. The agreement recites that Passco “is an experienced and sophisticated purchaser of commercial real estate projects,” the transaction was at arm’s length, and Passco was represented by counsel. Paragraph 10.13 recites that “the parties and their counsel have reviewed and revised this Agreement,” which the court read as showing negotiated rather than boilerplate terms (¶¶ 22–24).

That disposed of three fraud theories. The pre-sale questionnaire was “a document separate from the PSA,” so reliance on it was disclaimed (¶ 25). The inducement claim fell with it to the same extent (¶ 26). And the nondisclosure claim rested on the seller’s obligation under ¶ 2.1 to hand over insurance loss history and operation-and-maintenance manuals. It failed because ¶ 2.1 is not one of the carve-outs. It failed again because the same paragraph says the seller “makes no representations or warranties as to the accuracy or completeness of” the information it requires him to produce (¶ 28). A party can bargain for information without bargaining for the right to rely on it.

The surviving representation, and what it actually said

One representation was inside the carve-out: ¶ 7.1(e), in which the seller represented that to its knowledge it had “not received written notice from any governmental entity of a violation . . . nor any written notice that the Property is in violation of any applicable building or zoning code or ordinance” (¶ 35). Passco read that as covering any written notice from which a code violation might be inferred, and asked the court to take judicial notice of the San Antonio building code and treat the inference as a fact question (¶ 33). The defendants read it as covering a notice whose content is that the property breaches the law (¶ 32).

The court concludes Paragraph 7.1(e) is unambiguous and its meaning is clear and definite. According to its plain language, Paragraph 7.1(e) contemplates receipt of a written notice stating the Property is in violation of a building code. Contrary to Plaintiffs’ construction, it does not contemplate receipt of a written notice from which a building code violation might be inferred. 2026 Tex. Bus. 75, ¶ 36

The record held no evidence of a notice saying so, and the representation was therefore not false as a matter of law (¶ 37). With no false representation and no justifiable reliance, every fraud theory was negated (¶ 39), and the conspiracy claim and the alter-ego theory fell with them. Conspiracy fell because it is a derivative tort, and alter ego because it is a means of imposing liability for an underlying wrong rather than a wrong in itself (¶¶ 41–43).

The rule of law

On a record showing a sophisticated buyer, counsel, arm’s-length dealing and negotiated terms, a clear and specific disclaimer-of-reliance and “as is” clause negates justifiable reliance as a matter of law on every representation outside its carve-outs, including a pre-sale questionnaire and a document-delivery covenant that itself disclaims accuracy and completeness. And a representation that the seller has received no written notice that the property “is in violation” of a building code means a notice whose content is that the property is in violation, not a notice from which a violation might be inferred.

2026 Tex. Bus. 75, ¶¶ 19, 22–29 and ¶¶ 36–38.

“Other similar intangibles” does not mean “causes of action”

The last substantive holding is the one worth copying into a drafting checklist. Passco argued that ¶ 1.2(d) of the agreement, which assigned “all contract rights” and “other similar intangibles,” carried over the seller’s accrued claims under the pre-acquisition sub-management agreement (¶ 46). The court held it did not. The listed items are the community’s name and logos, promotional materials, the telephone number, contract rights, licenses, permits, deposits, utility agreements and sign easements. Those are things associated with continuing to own and run the property, not a damages claim under a terminated management contract. And decisively: elsewhere in the same agreement, at ¶¶ 2.4 and 10.8, “when the parties intended to address ‘claims’ or ‘causes of action’ in the PSA, they expressly used those terms” (¶ 47). The omission was read as intentional. On the evidence the management agreement was never assigned and was terminated on the day of closing, so there was nothing to assign (¶ 48).

The declaratory claims went the same way. A declaration that Passco had performed its own contractual obligations would govern no ongoing relationship and add no remedy beyond the contract claims already pleaded (¶ 54). A declaration that service of process was effective, and that two defendants had waived objections to service, capacity and jurisdiction, duplicated threshold questions already before the court (¶¶ 55–57). The court applied its own earlier decisions holding that a declaratory claim is permissible only if it has greater ramifications than the issues already before the court. Those are CRS Mechanical and Quintero, both cited by cause number and Westlaw citation in ¶ 53, alongside BHP Petroleum and Etan Industries.

In plain English

Passco bought a large apartment complex, found water pouring into the buildings two years later, and sued the developer, the manager and two executives for hiding what they knew.

The contract it signed, though, said in bold capitals that Passco was relying on its own inspection and not on anything the seller said, with three narrow exceptions. Texas enforces that kind of clause against a sophisticated buyer with its own lawyers. So the pre-sale questionnaire, where the seller answered “None” to a question about problems with the building envelope, could not support a fraud claim, because Passco had promised not to rely on it.

One promise did survive the clause: that the seller had received no written notice that the property violated the building code. Passco argued that documents showing unresolved leaks and sprinkler defects amounted to such a notice. The court read the promise literally: a notice saying the property is in violation, not papers from which someone could work out that it probably was. There was no such notice, so the promise was not broken.

What this ruling does not do: it finds nobody liable and awards nothing. It dismisses the fraud, conspiracy and declaratory claims against the seller’s parent partnership, the development company and the two executives, and a separate contract claim against the manager. Passco’s fraud and contract claims against the seller itself, which never asked for summary judgment, are still alive, and so is its claim on the manager’s May 31, 2019 sub-management contract.

The judgment rows, read off the decrees. No. 77: motion to remand denied; the case stays. Nothing else decided. No. 76: granted as to breach of the Terminal Agreement; granted as to breach of the Transportation Agreement; Event of Default declared as to Invoice No. 2025-07 under § 12.01; fees, pre-judgment interest, post-judgment interest and costs carried to trial; in any remaining respect denied, which includes damages on the Terminal Agreement. No. 75: the fraud, inducement, nondisclosure, conspiracy and declaratory claims against four defendants dismissed with prejudice, and the pre-acquisition sub-management claim against Kairoi Management dismissed with prejudice; the court expressly did not reach the capacity argument as to Rim WP Holdings LP (n.6). None of the three is a final judgment, and none awards damages. No. 76 does decide that Wink breached both agreements, and it declares an Event of Default; damages, fees and the rest go to trial.

Three opinions, one method

Set the three side by side and a similar move appears in each. In every one, part of the reasoning rested on what a comparable text said instead, and the omission was treated as a choice. It was not the only ground in any of them. No. 77 calls its comparison persuasive, not conclusive (¶¶ 19–20); No. 76 rests on the plain meaning of “default” and uses the carve-out as confirmation (¶¶ 26–27); No. 75 also found the management agreement was never assigned (¶ 48).

OpinionThe words in front of the courtThe words somewhere elseWhat the omission did
No. 77
¶¶ 12–20, 27–28
§ 25A.001(6): “this state” and political subdivisions § 22.220(d)(1), enacted the same session: “a university system or institution of higher education” MD Anderson’s agency status does not trigger the jurisdictional exclusion, and its suit for more than $315 million stays in the Business Court
No. 76
¶ 27
§ 12.01(c) of the Transportation Agreement: “failure . . . to comply with any of its obligations” The same clause’s single carve-out for “non-material noncompliance” with § 18.01 Every other non-compliance, however small, is a default once the cure period runs
No. 75
¶ 47
¶ 1.2(d) of the purchase agreement: “other similar intangibles” ¶¶ 2.4 and 10.8 of the same agreement: “claims” and “causes of action” Accrued claims under a terminated management contract did not travel with the property

It would be easy to overread this. The canon is old, it is not peculiar to this court, and two of the three applications are contract construction rather than statutory construction. What is worth noticing is narrower and practical: both divisions that sat this week, and both judges who wrote (Judge Barnard wrote two of the three), used internal comparison as part of the reasoning, and in each case the comparator was a document the drafter controlled: the same session’s statute, the same clause’s carve-out, the same agreement’s other paragraphs. For a transactional lawyer that converts a canon into a checklist item. If you qualify a term in one place, assume a court will read the unqualified uses as deliberate. If you name “claims” in two paragraphs, do not expect a third paragraph’s catch-all to carry them.

Elsewhere: the Rule 14a-8 comment window closes November 20

Away from the Business Court: the SEC’s proposal to rescind Rule 14a-8, the federal shareholder-proposal rule, was published in the Federal Register on September 21, 2026, and comments are due on or before Friday, November 20, 2026 (Release No. 34-106383). We report the deadline; we take no position on the rescission here.

New petitions

Three new Business Court dockets appeared in the coverage window. The rows below are drawn from the court’s own re:SearchTX exports as this publication’s docket feed carries them, captured Saturday, October 31, 2026 at 12:02 UTC. These are docket metadata. No petition in this table has been read, and nothing here characterises any party’s claims.

New Business Court dockets, October 25–31, 2026. Captions are reproduced as the export gives them.
FiledDocketCaptionCourt / type
Mon Oct 26 26-BC01A-0095 WSC Lender, LLC v. Timothy Clark and Mark Bucsis Business Court, First Division (1A) · Debt/Contract – Other. The export carries a Notice of Docket Equalization Assignment filed the same day and names two different judges in different rows; the assignment is not settled on the export’s face. Plaintiff’s original petition filed Oct 26; citations issued Oct 28.
Thu Oct 29 26-BC11B-0125 ExxonMobil Oil Corporation v. Sunoco Pipeline L.P., Permian Express Partners LLC, Permian Express Terminal LLC Business Court, Eleventh Division (11B) · Dorfman, J. · Debt/Contract – Other
Fri Oct 30 26-BC03B-0043 1141 Shady Associates LP, LLC v. AMRES Operating LLC, Amherst Capital Management LLC, Amherst Residential, LLC Business Court, Third Division (3B) · Sweeten, J. · Debt/Contract – Other
A caution about the second row, and one about what is not in the table

The named plaintiff in 26-BC11B-0125 is ExxonMobil Oil Corporation. The named defendants are Sunoco Pipeline L.P. and two Permian Express entities. Each of those names is an entity-level party as the court’s export gives it, and none of them is the SEC registrant that this publication’s Reincorporation Index tracks. Whether and how these parties relate to any registrant in that cohort is an entity-resolution question, and this issue does not answer it. Readers should not read a corporate affiliation into a caption.

Three Fifteenth Court dockets also surfaced in the export this week, and none is in the table. Two opened in the window, both styled in the name of the Governor of Texas in his official capacity (15-26-00189-CV and 15-26-00190-CV). Nothing in the export ties either to a Business Court cause, and this publication reports the Fifteenth Court only where it sits over Business Court matters. The third, Plains Pipeline, L.P. v. Arrowhead Gulf Coast Holdings, LLC (15-26-00188-CV), first appeared in the export on Wednesday, October 28, but the Fifteenth Court’s own docket shows it filed on Friday, October 23, before this window.

Dockets and calendar

One of this week’s three opinions leaves a dated trail, and it is unusually precise about it.

Settings in the cases behind this week’s opinions, and in the case behind 2026 Tex. Bus. 74. Court metadata from this publication’s Business Court docket-alert feed, captured Saturday, October 31, 2026 at 12:02 UTC. These are settings, not orders. Confirm any one of them with the division’s court coordinator before relying on it.
DateSettingCase
Tue Nov 3, 1:30 pmSummary-judgment oral hearingESI Inc. of Tenn. v. Orion Engineered Carbons · 26-BC11A-0075 · the plant owner’s own summary-judgment motion is pending, and 2026 Tex. Bus. 74 did not decide it
Wed Nov 4, 9:30 amPre-trial conferenceDK Trading & Supply v. Wink to Webster Pipeline · 25-BC11B-0073
Tue Nov 24, 9:00 amPre-trial hearingDK Trading & Supply v. Wink to Webster Pipeline · 25-BC11B-0073
Tue Dec 1, 8:30 amBench trialDK Trading & Supply v. Wink to Webster Pipeline · 25-BC11B-0073

The last row is the one to hold onto. At ¶ 35 the court declined to award fees because the motion was granted only in part, and said it would address them after “the bench trial on the remaining merits of this suit, which will commence in five weeks.” Five weeks from the signature date falls on Wednesday, December 2; the feed carries a bench-trial setting on Tuesday, December 1. We report both, and we are not going to reconcile the court’s round number with a docket entry. What the two together say is that an opinion resolving breach but not damages was written with a trial date in sight, which is the context for reading ¶¶ 14–19 as a narrowing of the trial rather than a defeat.

Nothing in the feed shows a forward setting in either 26-BC04A-0002 (Passco) or 26-BC11A-0097 (MD Anderson) as of this capture.

Selected Business Court settings, Monday, November 2 to Friday, November 20, 2026, from the same capture. This is a selection, not a complete calendar; the capture carries 73 live settings in that span across all divisions. Trials run multiple days and are listed on their first day in the window.
DateSettingCaseDiv.
Mon Nov 2Jury trialWestlake Longview Corporation and Westlake Chemical OpCo LP v. Eastman · 24-BC11B-002311B
Mon Nov 2Bench trial, continuingPanola Operating, LLC and Axe Directional Drilling, LLC v. Ironman Recycling · 25-BC11A-008511A
Mon Nov 2Bench trialAmadeus North America, Inc. and Amadeus IT Group SA v. Optym, Inc. · 26-BC01B-00041B
Mon Nov 2Temporary-injunction hearingContinent Communications, LLC and Continent Com Operating, Inc. v. VTX · 26-BC08A-00288A
Mon Nov 2Motion for summary judgmentSMW Projects, Inc. and SMW Industrial, LLC v. Lotte Chemical Louisiana · 26-BC11B-003411B
Tue Nov 3Motion for summary judgmentWilliam Woodruff, individually and as trustee · 26-BC03B-00283B
Wed Nov 4ConferenceSpencer Miller, in his personal capacity and derivatively on behalf of… · 26-BC01B-00101B
Thu Nov 5MotionLa Grange Acquisition, L.P. d/b/a Energy Transfer Company and ET Procurement · 26-BC11B-006311B
Thu Nov 5Summary-judgment oral hearingGail Corder Fischer v. Clifford R. Fischer and Clifford Fischer & Company · 26-BC08B-00098B
Mon Nov 9Jury trialSalof LTD., Inc. v. JAX LNG, LLC · 25-BC11A-002511A
Mon Nov 9Bench trialEnduring Resources IV LLC v. IKAV Energy, Inc. and SIMCOE LLC · 25-BC11A-006311A
Mon Nov 9Bench trialJ&J Maintenance, Inc. d/b/a J&J Worldwide Services, Inc. v. King & George · 25-BC08B-00088B
Mon Nov 9Special appearanceClearway Energy Group LLC v. Shannon Bachart et al. · 26-BC08A-00298A
Mon Nov 16Jury trialFSTI, Inc. v. PVS Minibulk, Inc. and PVS DX, Inc. · 26-BC03A-0010, the case behind 2026 Tex. Bus. 69 and 733A
Mon Nov 16HearingJesse D. Windrix, derivatively on behalf of JSW Enterprises, LLC · 26-BC01A-00301A
Mon Nov 16Pre-trial conferencePreston Hollow Capital, LLC and PHCC LLC v. Truist Bank · 25-BC01B-0030, the case behind 2026 Tex. Bus. 51B
Wed Nov 18Summary-judgment hearingChaac Pizza Northeast LLC v. Pizza Hut LLC · 26-BC01A-00371A
Thu Nov 19MotionToby Neugebauer and Vicksburg Investments Management, LLC v. Fermi, Inc. · 26-BC01B-00341B

Carried forward